How to Assemble the Shapeoko 4 CNC Router



A primer on the steps required to build the Shapeoko 4.

Build Notes:
– In the last box (“Controller”) there is a small bag of extra/spare fasteners. If you are missing a screw, check there for a replacement first.
– V-Wheels will be black on production machines.
– When you are installing the drag chains, there are plastic spacers that get installed under the drag chain tails.
– The Y-Axis homing switch trigger (cylindrical piece with one threaded end) needs to be installed manually onto the back of the right gantry endplate.

—–

Video summary:
0:00 – Intro
0:57 – Assemble Hybrid Table Base
2:30 – Mount the Y-Axis Extrusions
3:15 – Install Gantry
3:42 – Install Endplates
4:20 – Squaring the Frame
6:19 – Hanging the X-Axis Carrier Plate, Adjusting V-Wheels
7:40 – Running the GT2 Belts
9:09 – Mounting the X-Axis
9:41 – Running the “Data” Drag Chains
10:59 – Mounting the Router & Drag Chains
12:56 – Installing the Hybrid Table Slats
14:02 – Installing the Controller & Cable Management
14:43 – Software Initialization

source

Comments are closed.

Scroll to Top